Please use this identifier to cite or link to this item: http://ir.juit.ac.in:8080/jspui/jspui/handle/123456789/5227
Title: Use of Construction Management Tools in the Tunneling Project of UHL- III (100 MW)
Authors: Mehra, Nishant
Gupta, Ashok Kumar [Guided by]
Keywords: Sprayed concrete lining
Hydroelectricity
Tunnel construction
Tunnel
Issue Date: 2014
Publisher: Jaypee University of Information Technology, Solan, H.P.
Abstract: Hydroelectricity is not just a cheap and clean form of energy, but also very important for the development of India to meet growing energy demands. Thus, the importance of tunnel construction is vital. Modern construction methods can drastically reduce the cost of tunnel excavation and hence money saved could be used for further development of the country. The thesis is the step in the same direction. Certain modifications in the principles used in existing excavation of tunnels can drastically reduce the cost and time of the excavation of tunnel, thus saving considerable money. Improvements were made in the form of increasing the number of adits, improvements in the de-watering system, drilling jumbos, explosive types, excavators and dumpers and comparative analysis was done between the systems employed in the existing tunnel excavation and modified tunnel excavation.
Description: Post Graduate Programme in Construction Management (PGP CMT)
URI: http://ir.juit.ac.in:8080/jspui//xmlui/handle/123456789/5227
Appears in Collections:Dissertations (M.Tech.)

Files in This Item:
File Description SizeFormat 
Use of Construction Management Tools in the Tunneling Project of UHL- III (100 MW).pdf2.35 MBAdobe PDFView/Open